High Level Plan
Ticket sales
The FOMO Sale is January 31, 2024 at 12 PM PST–February 4, 2024 at 6 PM PST.
Stewards Sale is March 1, 2024 at 12 PM–March 8, 2024 at 12 PM PST.
Build Plan
Here's what we need to accomplish this year BEFORE anything else:
- Get box trucks, one for power & water, and one for kitchen & food
- Make sure the trucks are in great running condition
- Move our solar power infrastructure into the Power truck
- Boost our power storage capacity (more batteries)
- Manufacture an easy apparatus to deploy our solar panels upon arriving on Playa
- Fit the power truck with infrastructure for water (pumps, hookups, etc).
- Move our kitchen equipment into the Kitchen truck
- Fit both trucks with secure shelving for all of our crap, including water jugs, propane tanks, shade structure, etc.
- Figure out how to store everything we need into those trucks
- Make sure the trucks have towing capabilities & towing equipment
- Get rid of storage in Reno because now everything's permanently on two trucks
- Figure out where to store those trucks while we're home & sign agreement
Before we start
- Create a plan
- Publish the plan & start advertising HARD
- Facebook has several (many!) BM groups
- Establish leadership (part of the plan creation)
- Reach out to ex campers:
- Some will want to come back regardless (hardcore fans)
- Some may need convincing and will only come back if things improve (see comment)
- Some have already abandoned to other camps or events (for example Africa Burn)
- Some just won't go in 2024, regardless of anything
Note: It is always a good idea to make joining the camp irresistible, and I believe this is something every camp should be doing (and some of them are doing a great job with this).
Planning Requirements
- Planning
- Plan what build looks like
- Plan what the week looks like
- Plan how nutrition & hydration works
- Consider food prep / meal prep
- KISS & LAZY!!!!
- Plan how LNT & Garbage works
- Plan what breakdown looks like
- Publish this plan in https://docs.nyd.nyc
- Prepare our basic/core infrastructure
- Design it such that the laziest, smallest team can EASILY build & breakdown
- Design our volunteer structure (deposit + refund on successful volunteering)
- Advertise our “job openings” and start soliciting members (other camps have already begun)
- Designate our lead team members and create one Discord room for each team
- Actually get our asses to Gerlach and build our infrastructure
- Can ship a bunch of the stuff to LA and I can drive with it upstate
- Build it & Test it and make sure it’s perfect!
- Make sure we schedule service to move this stuff to Playa on time